Life in Mainland China
High-speed rail: a Chinese conversation with pinyin and English
China's high-speed rail network, the Fuxing trains, the 12306 ticket app, the Beijing-Shanghai line and the Spring Festival travel rush.
Play: High-speed railThe conversation
Speakers: Haoran and Xiaoyu.
- Haoran
看屏幕上那个数字了吗?时速350公里。
See that number on the screen? 350 kilometers an hour.
- Xiaoyu
我茶杯里的水居然连波纹都没有,怎么回事?
There isn't even a ripple in my teacup. How is that possible?
- Haoran
这是复兴号,从2017年6月起就在这条线上跑了。
This is a Fuxing bullet train. They've been running on this line since June 2017.
- Xiaoyu
你接下来是不是要报出它的列车型号了?
Are you about to recite its exact train model numbers now?
- Haoran
北京南发车的是CR400AF,上海虹桥发车的是CR400BF。
The ones departing from Beijing South are CR400AF, and the ones from Shanghai Hongqiao are CR400BF.
- Xiaoyu
那到2025年底,全国高铁网总里程大概有多少?
So by the end of 2025, about how long is the country's total high-speed rail network?
- 大约50,400公里高铁线路 Around 50,400 kilometers of high-speed rail lines
- 大约5,000公里 Around 5,000 kilometers
- 大约500,000公里 Around 500,000 kilometers
Answer
大约50,400公里高铁线路 Around 50,400 kilometers of high-speed rail lines
- Haoran
大概50,400公里。随着西安到延安段开通,正式突破了五万公里。
Around 50,400 kilometers. Once the Xi'an to Yan'an section opened, it officially topped 50,000 kilometers.
- Xiaoyu
咱们现在坐的这条京沪线呢?
What about this Beijing-Shanghai line we're on right now?
- Haoran
全长1,318公里,2011年开通的,前15年累计发送旅客超过23亿人次。
It's 1,318 kilometers long, opened in 2011, and has carried over 2.3 billion passengers in its first 15 years.
- Xiaoyu
我觉得我一个人就贡献了里面的一半。
Pretty sure I contributed at least half of that myself.
- Haoran
你赶过春运回家吗?
Have you ever tried heading home during the Spring Festival rush?
- Xiaoyu
过年那四十天大迁徙嘛。我就经历过一次,从成都一路站到个记不清名字的地方。
You mean that forty-day mass migration for New Year. I only did it once, stood the whole way from Chengdu to some town I can't even remember.
- Haoran
光是2025年春运,铁路就发送了5.13亿人次。
During the 2025 Spring Festival travel rush alone, the railways carried 513 million passengers.
- Xiaoyu
我全记着呢,因为全踩在我脚上了。
I remember every single one, 'cause they were all standing on my feet.
Words in the conversation
Notes
Network size and growth
At the end of 2025 China had about 50,400 km of high-speed railway in operation, up from 37,900 km at the end of 2020. The network passed 50,000 km with the opening of the Xi'an to Yan'an line on 26 December 2025. The whole national railway network was about 165,000 km at the end of 2025. The operator's stated aim is about 60,000 km of high-speed line by 2030. Railways carried more than 4.5 billion passenger trips in 2025.
Fuxing trains
The Fuxing ("rejuvenation") trains entered service on 26 June 2017 on the Beijing-Shanghai line: a CR400AF from Beijing South and a CR400BF from Shanghai Hongqiao. Top speed is 400 km/h, and they run at a consistent 350 km/h, a pace first run on 21 September 2017. The earlier generation of bullet trains was called Hexie ("harmony"). The CR400AF is built by CRRC Qingdao Sifang, the CR400BF by CRRC Changchun.
Tickets: 12306
12306 is China Railway's ticket website and app, where tickets are bought by real name.
Stations
Tickets are tied to an identity document, shown to enter the station and again to board the train.
Beijing-Shanghai line
The Beijing-Shanghai high-speed railway opened on 30 June 2011 and is 1,318 km long. In its first 15 years (to June 2026) it ran more than 2.22 million trains and carried more than 2.3 billion passenger trips. In 2018 the fastest scheduled trip was 4 hours 18 minutes. Xinhua called it China's busiest rail route in 2017.
The Spring Festival travel rush
The Spring Festival travel rush (chunyun) lasts 40 days around the Lunar New Year. In 2025 it ran from 14 January to 22 February, and railways carried about 513 million passenger trips, 6.1 percent more than the year before. The 2026 rush ran from 2 February to 13 March, with about 9.41 billion cross-regional trips across all transport. On 21 February 2026 rail carried about 17.19 million trips in one day.
High-speed rail
China's high-speed rail network, the Fuxing trains, the 12306 ticket app, the Beijing-Shanghai line and the Spring Festival travel rush.
About how long was China's operating high-speed rail network at the end of 2025?
Answer
50,000 km. China State Railway Group put it at about 50,400 km at the end of 2025.
What is the name of the trains that entered service on the Beijing-Shanghai line in June 2017?
Answer
Fuxing. Fuxing means "rejuvenation"; the earlier generation was called Hexie, "harmony".
What is the usual top operating speed of a Fuxing CR400 train?
Answer
350 km/h. The trains are designed for 400 km/h and run at a consistent 350 km/h.
What do you show to enter a station and board a train?
Answer
The ID used to buy the ticket. Tickets are tied to an identity document, and the same document is checked at the station.
When did the Beijing-Shanghai high-speed railway open?
Answer
2011. It opened on 30 June 2011 and is 1,318 km long.
About how many rail passenger trips were made during the 40-day Spring Festival travel rush of 2025?
Answer
513 million. China State Railway Group reported about 513 million rail trips, a record at the time.